11 Free Renovation Budget Worksheets (Printable Set)
Eleven blank worksheets I use before signing a renovation quote. Print them once and reuse them on every project — the tables are deliberately plain so they survive a photocopier and a site visit.
Planning ranges are in US dollars and are illustrative. Always price against written local quotes; nothing here is a substitute for a licensed contractor or an engineer.
A.1 Project brief
One page that fixes the scope before anyone prices it. The exclusions line is the one that prevents change-order arguments.
| Field | Your answer |
|---|---|
| Rooms / dimensions | |
| In / out | |
| Finish level + reference | |
| Fixed constraints | |
| Done criteria | |
| Exclusions | |
| Two corners I am holding | |
| Safety / function / appearance items |
A.2 Budget shell
Five mandatory lines. Every amount needs the assumption behind it and the quote it came from.
| Line | Amount | Assumptions | Quote ref |
|---|---|---|---|
| 1. Materials | |||
| 2. Labour | |||
| 3. Allowances | |||
| 4. Fees / services | |||
| 5. Contingency | |||
| Total |
A.3 Contingency score and reserve log
Size the reserve from eight risk factors, then log every draw so the balance is always visible.
| Risk 1-8 (tick) | Total score | Reserve % | Reserve amount |
|---|---|---|---|
Reserve draw log
| Date | Reason | Draw | Balance |
|---|---|---|---|
A.4 Splurge / save matrix
For each element, write the premium option and the cheaper one before you decide. The decision column is the whole point.
| Element | Splurge option | Save option | Decision | Amount |
|---|---|---|---|---|
A.5 Finish selection and takeoff
Quantities before quotes. Waste percentage and lot number decide whether two rooms match.
| Area | Product | $/sq ft | Waste % | Qty | Prep | Install | Total | Lot |
|---|---|---|---|---|---|---|---|---|
A.6 Rent or buy
Break-even days = (purchase - resale + extras) / rental per day. If you need it longer than that, buy.
| Tool | Purchase | Resale | Extras | Rental/day | Break-even days | Days needed | Decision |
|---|---|---|---|---|---|---|---|
A.7 Three-bid comparison
Put the three bids on the same lines, then normalise the scope. The cheapest total is often the one with the largest exclusions.
| Line | Bid A | Bid B | Bid C | Notes |
|---|---|---|---|---|
A.8 Timeline and long-lead items
Duration plus buffer, and what each phase waits for. Cure times and permits belong here, not in your head.
| Phase | Start | Duration | Buffer | Depends on | Actual |
|---|---|---|---|---|---|
Long-lead items
| Item | Order by | Lead time | Needed | Ordered | Delivery |
|---|---|---|---|---|---|
A.9 Purchase tracker
One row per lot. Return window and storage location are the two columns people add after the first mistake.
| Item / SKU | Supplier | Order # | Qty | Lot | Cost | Due | Received | Return by | Stored |
|---|---|---|---|---|---|---|---|---|---|
A.10 Change-order log and punch list
A numbered, signed change order is the only thing that stops a verbal instruction becoming a billing argument.
| # | Date | Change | Cost | Days added | Approved by |
|---|---|---|---|---|---|
Punch list
| Punch item | Location | Who | Due | Rechecked |
|---|---|---|---|---|
A.11 Final reconciliation
Planned versus actual, line by line, with the reason. This is the only document that makes the next project cheaper.
| Line | Planned | Actual | Variance | Why |
|---|---|---|---|---|
Want the whole workbook?
The paid version adds the worked examples, the eight risk factors behind the contingency score, the rent-or-buy formula and a 30-page guide — the sheets below stay free.